Project

Tronox, a leader in the production of high-quality titanium products, tasked TTS Built (TTS) with constructing a 165-person camp at Atlas-Campaspe mine outside Balranald, near Mungo National Park in New South Wales.

Canteen
Tronox 5

Process

The project, situated in an isolated location, required the development of a temporary camp to support the workforce involved in extracting and processing mineral sands. TTS was enlisted to build the accommodation camp from scratch, incorporating a range of facilities, including a kitchen, gym, recreation centre, laundries, and a sports court.

The construction of the Tronox Mineral Sands Camp presented familiar challenges due to its remote location, which imposed logistical hurdles and threatened a consistent supply of materials. Frequent rains also beset the project, delaying construction activities and increasing the risk of damage to the in-progress structures. The need for immediate response times, alongside ongoing work under these testing conditions, required a highly specialised approach.

TTS leveraged its extensive network and experience in remote constructions to navigate the obstacles presented by the Tronox project. By deploying a team of 40 skilled staff, including carpenters, plumbers, electricians, concreters, roofers, and communications technicians, TTS showcased its ability to organise a comprehensive workforce adept at working under challenging conditions. 

The weather disruptions were managed effectively by flexible planning and adaptive responses; when on-site work was hindered by rain, the team redirected their focus to planning and other preparatory tasks. Coordination of material transport ensured the project's steady progress, underscoring TTS's capability to solve multifaceted logistical challenges through meticulous resource management and strategic planning.

The Result

The Tronox Mineral Sands Camp project was completed within the designated time frame of an estimated nine months in 2022. It featured fully functional accommodation and recreational facilities built to support the 165-personnel team. The project was a testament to TTS's ability to accomplish significant cost and time efficiencies despite unpredictable weather challenges and logistical constraints. 

Through strategic planning, skilled workforce management, and efficient problem-solving capabilities, TTS delivered a comprehensive solution that met and exceeded the client's expectations for the Tronox Mineral Sands Camp project. This project's success confirms TTS's status as a leader in remote construction projects, ready to tackle the challenges of building in Australia's outback with professionalism and expertise.